Project Overview

BECOME is structuring a physical demonstrator project to investigate the integration of data infrastructure, a new solar farm, cooling solutions and intelligent management tools.

The initiative aims to explore the technical, energy and organisational conditions for developing resilient, replicable data centres that support local control over data.

A location in southern Tunisia is under consideration. The project plans the development of a solar farm associated with the demonstrator, rather than the use of an already operational solar installation.

BECOME leads applied research, scientific coordination, testing and validation of the innovations. Industrial development, construction and operation of the data centres are intended to be undertaken by a dedicated infrastructure organisation, separate from the Institute.

A physical demonstrator with an industrial purpose

The project brings infrastructure, energy, cooling and operating requirements into one validation setting. The question is how these elements can work together under the conditions of a real location, with costs, dependencies and maintenance requirements that can be examined.

The aim extends beyond a standalone study. Validated innovations are intended to inform facilities that can subsequently be constructed and operated. No hosting service or available computing capacity is being offered by BECOME through this project page.

The proposed proof of concept includes a physical data centre module combining compute, data storage, networking, power supply, cooling, monitoring and security.

The objective is to evaluate the system as a whole: producing and using energy, managing temperature and scheduling workloads while meeting the agreed service requirements.

Sizing will depend on the selected site, initial users and test programme. Exclusively solar operation or continuous energy autonomy is not assumed. These possibilities can only be assessed against the final configuration and the results.

From Research to Operation

The research programme and the future infrastructure activity have complementary but separate responsibilities.

The dedicated infrastructure organisation's identity and delivery arrangements remain to be defined. The project does not announce an established operator, a completed facility or secured investment.

  • BECOME Institute

    Applied research, design and evaluation of innovations, test protocols, validation and exploitation of results for which its rights are established.

  • Dedicated infrastructure organisation

    A separate organisation intended to undertake industrial development, construction, commercialisation and operation of the data centres.

Four connected areas of research and validation

The demonstrator will be scoped to examine the interactions between infrastructure components and the conditions required for practical use. The following themes are research directions, not claims of performance already demonstrated.

  • Energy and service continuity

    Study how the planned solar generation can be integrated with the data centre's needs, other energy resources and continuity arrangements. Generation, workload and continuity requirements will be considered together; exclusively solar operation or continuous autonomy is not assumed.

  • Cooling and local conditions

    Evaluate cooling approaches suited to the proposed location, considering energy consumption, water needs and maintenance. Selection will depend on feasibility and the test conditions agreed for the demonstrator, not a predetermined performance claim.

  • Intelligent management and digital twin

    Explore monitoring, simulation and decision support to understand how the installation behaves and where its operation could be improved. Models and proposed control approaches will need assessment against observed behaviour and the operating limits of the demonstrator.

  • Local control over data and replication

    Examine governance, access, security, skills transfer and the conditions for adaptation to other territories. Local control will be considered through defined responsibilities and operating capabilities, rather than location alone.

AI and digital twin approaches are intended to help compare configurations, anticipate requirements and analyse differences between expected and observed operation. Control strategies will be tested within the safety limits defined for the site.

Research may address interfaces, components or cooling configurations suited to the demonstrator's constraints. Integration will depend on technical maturity and validation. Experimental elements will remain isolated from critical functions until their behaviour is sufficiently established.

The architecture will need to include documentation, monitoring, maintenance procedures and recovery capabilities. Technology choices will be examined in relation to cost, maintainability and the conditions under which suppliers can intervene. The ability to move data or services will be considered from the design stage.

Define what the demonstrator must establish

A useful validation programme should connect technical measurements with questions about operation, cost and future deployment. Partners will need to define the reference conditions, the results required and the criteria for deciding whether to continue.

The work should make energy and cooling requirements, maintenance needs, operating responsibilities and remaining dependencies understandable. Resilience, replicability and affordability are objectives to evaluate, not established properties of a facility that has already been built.

The project aims to document processing and backup locations, administrator access, encryption-key management and the conditions for service-provider intervention.

Testing will also examine what a local team can perform: routine administration, planned maintenance, service restoration and access control.

Reversibility is a design criterion. It includes the ability to retrieve data, migrate services and continue operations under conditions defined in advance.

Protecting each user's data remains central. National or local control of the infrastructure must not mean indiscriminate access to the information it hosts.

We seek international technology cooperation compatible with this local control, with known dependencies and explicit responsibilities.

From structuring to industrial deployment

The project is currently in its structuring stage. Feasibility work, the physical demonstrator, validation and subsequent industrial transfer or deployment form the envisaged development pathway. Dates, capacity and technical maturity targets will follow the agreed scope rather than precede it.

A location in southern Tunisia remains under consideration. Progress depends on the final site, land rights, authorisations and financing. The demonstration should help identify which validated elements can be reused and which adaptations another territory would require.

The demonstrator is intended to establish a modular architecture that can evolve with demand and be adapted to different territories.

Future deployments will need to account for climate, energy, connectivity, expected services and local requirements. A common foundation should allow validated elements to be reused without imposing an identical configuration on every site.

Financing for the proof of concept would support demonstration and technology maturation. Financing for subsequent sites would depend on the findings, documented costs and established commercial needs.

  1. Structuring (current)
  2. Feasibility (planned)
  3. Demonstrator (planned)
  4. Validation (planned)
  5. Transfer or Industrial Deployment (planned)

Current stage: Structuring. Later stages are planned and remain subject to feasibility, resources, validation results and the relevant agreements.

Separate research value from infrastructure operation

For BECOME, potential collaboration pathways include research contracts, co-development, validation campaigns and technology licensing where results and rights allow. These activities remain tied to its applied research and innovation role.

Future hosting and infrastructure-operating revenues are intended to belong to the separate infrastructure organisation's activity. They are not presented as revenue already secured or directly earned by BECOME. Commercial hosting offers would be developed by the operator only when they are actually available.

Initial use cases to guide the design

The demonstrator will be sized around services defined with its first users, rather than a theoretical capacity to be filled later.

Use cases to be qualified include application hosting and computing environments for research or industrial activities. They will help establish performance, availability, security and cost requirements.

Earth-observation data processing is a possible application connected to SpaceTech & Earth Intelligence. Combined with authorised local data, this information could support questions concerning water, climate or infrastructure.

These applications would share the same demonstrator. Selection will depend on their usefulness and the commitments made by users.

Technical and economic validation for investment decisions

The programme should produce a documented set of results that supports a decision about the next stage, not simply demonstrate that a module can run.

  • System performance

    Measure the services delivered, energy and resources consumed, thermal behaviour and response to controlled disturbances.

  • Whole-life cost

    Assess equipment, operation, maintenance and replacement costs at different levels of utilisation, including adverse scenarios.

  • Operational control

    Test the tasks performed locally, the traceability of interventions and the procedures for restoring services.

  • Replication readiness

    Describe and cost the components, interfaces, skills and adaptations required for a second deployment.

Success criteria will be defined before testing begins. Performance will be compared with a reference configuration, with limitations clearly documented.

Contributions to the demonstrator

Energy, cooling, digital infrastructure and operating partners can propose capabilities relevant to the integrated system. Scientific teams can contribute methods, experimental work and evaluation. Local users and territorial organisations can help define needs and operating constraints.

Institutional and funding partners can discuss the resources required for a defined stage. Each contribution will need an agreed scope, responsibilities and conditions for using the results. Expressing interest does not itself establish a project partnership or a financing commitment.

Contributions may include financing, equipment, engineering, experimental capabilities or commitments to use the infrastructure. Participation and exploitation terms will be negotiated before the relevant work begins.

Build the first demonstration together

Can you contribute capabilities in energy, cooling, digital infrastructure, operations or territorial development? Tell us about your potential contribution to the demonstrator.

Start with a concise description of your organisation, the need or capability you bring and the next stage you would like to discuss. Detailed technical and commercial information can follow through an appropriate qualified exchange.

Discuss a Demonstrator ContributionDiscuss Partnership and Project Financing

Please share only non-confidential information in your initial enquiry.

Related expertise